Cabinet refacing in Palm Harbor starts at $7,000. Most medium kitchens run $10,000 to $12,500, and the work takes 5 to 7 working days. We work across Palm Harbor, Ozona and Crystal Beach from our shop on Starkey Road in Largo.
Refacing is for when your layout works and your boxes are solid, but you want a new style: brand-new doors and drawer fronts on the cabinets you already have. Every number here matches our cabinet refacing page.
What Cabinet Refacing Costs in Palm Harbor
Smaller kitchen
From $7,000 · 15–20 doors
New doors and drawer fronts in the style you choose, same layout.
Medium kitchen
Most projects $10k–$12.5k · 30 doors, 15 drawers
The most common kitchen we reface, panels included.
Large kitchen
Most projects $13k–$18k · 40+ doors
Bigger layouts, more glass doors and panels.
Typical ranges from our recent projects, including typical materials. Your written estimate, built after we see your space, is what your project is priced on.
What Is Included
- New doors and drawer fronts in the style you pick.
- Soft-close hinges and drawer slides, standard.
- The cabinet boxes finished to match.
- 5 to 7 working days on site; 2 to 3 weeks if you add countertops and backsplash.
Countertops are optional with refacing, unless we add a cabinet or two. Then new countertops are required, because the old top will not fit the new layout.
Solid wood and plywood boxes are usually good candidates, and we tell you at the consultation if yours are not.
See refinishing vs. full replacement.
Refacing or Refinishing?
If you like your door style and just want a new color, refinishing in Palm Harbor starts at $5,000. If the layout or the boxes no longer work, a full kitchen remodel starts at $28,000. Our Refinish, Reface or Remodel? guide helps you choose.
Questions We Hear in Palm Harbor
How much does cabinet refacing cost in Palm Harbor?
Cabinet refacing starts at $7,000 for a smaller kitchen. Most medium kitchens run $10,000 to $12,500 and large kitchens $13,000 to $18,000.
How long does refacing take?
5 to 7 working days. With new countertops and backsplash, plan on 2 to 3 weeks.
Are soft-close hinges included?
Yes. Soft-close hinges and drawer slides are standard on every refacing job.
Do I need new countertops?
Only if we add a cabinet or two. Otherwise countertops are optional.
Ready for a price on your Palm Harbor cabinets?
