Bathroom Remodeling in Dunedin, FL

Bathroom remodels in Dunedin start at $17,000 for a hall bath when you supply the tile and fixtures. Tub-to-shower conversions run $23,000 to $28,000, primary bathrooms $32,000 to $45,000, and most bathrooms take 3 to 4 weeks on site. We work across Dunedin, Palm Harbor and the Causeway, a short drive up Alt 19 from our Largo shop.

Every number on this page matches our bathroom remodeling page.

What a Dunedin Bathroom Remodel Costs

Hall bathroom

From $17,000 · most $17k–$21k

Keep the tub; new tile surround, vanity, toilet, floor and lighting. When we supply every material, plan on $21,000 and up.

Tub-to-shower conversion

From $23,000 · most $23k–$28k

A new waterproofed walk-in shower with glass where the tub used to be. See what is included.

Primary bathroom

From $32,000 · most $32k–$45k

Large walk-in shower, double vanity, glass enclosure and tile throughout.

These starting prices are for the work. Most of what you pick out (tile, vanity, toilet, faucets, lighting, mirror) is budgeted separately as your selections, or you can supply it yourself.

What Moves the Price

  • Older homes. Many Dunedin homes near downtown and the Causeway are 1950s and 1960s builds. Opening walls in those homes often means updating wiring and plumbing to current code, and we price that in writing before work starts.
  • Curbless, no-step showers add $2,500 and up.
  • A vent fan where there is none today adds $800.
  • Niches and benches run $350 for a recessed niche and $400 for a bench.

Our aging-in-place bathroom guide features a Dunedin bathroom we remodeled.

Permits in Dunedin

If your project moves plumbing, adds circuits or changes a wall, it needs a permit. We pull it with the city, town or county that covers your address and build the inspection days into your schedule.

How We Build a Shower

  • Taken down to the studs, never tiled over.
  • A real waterproofing system behind the tile and a pan sloped to the drain.
  • Licensed plumbing and electrical.
  • One project manager start to finish.

Questions We Hear in Dunedin

How much does a bathroom remodel cost in Dunedin?

With us, hall baths start at $17,000 when you supply the tile and fixtures, tub-to-shower conversions run $23,000 to $28,000, and primary bathrooms $32,000 to $45,000.

How long does a bathroom remodel take?

Most bathrooms take 3 to 4 weeks on site. Permits, inspections and custom glass are what extend it.

Who pulls the permit?

We do, with the city, town or county that covers your address.

Can I stay home during the remodel?

Yes, most customers do. If it is your only bathroom, plan where you will shower for a few weeks.

Ready for a written price on your Dunedin bathroom?

Book a Free Consultation Call (813) 489-1552